$11.5 million clean-up project at former Newcastle Gasworks site is due to start early 2019

Posted by | August 12, 2018 | Community, Industry News, News

1

An $11.5 million clean-up project at the former Newcastle Gasworks site could start early next year, paving the way for a future development on the Hamilton North site.

The 12-month project would see the heavily contaminated site, which has laid dormant since the mid-1980s, concrete capped and rehabilitated to a level suitable for commercial or industrial purposes.

Newcastle Gasworks operated on the seven hectare site between 1913 and 1985. It left in its wake one of the region’s heavily polluted legacies.

An analysis of contaminants revealed a range of known carcinogens, potentially carcinogenic compounds and toxic compounds including benzene, polycyclic aromatic hydrocarbons (PAHs), total recoverable hydrocarbons (TRH), benzo(a)pyrene, cyanide, ammonia and lead.

A 2016 report noted some of the toxins, including cyanide, ammonia and lead, were leaching into groundwater and posed a risk to human health and the Hunter River, NSW Department of Planning documents show.

Source: https://www.theherald.com.au/news/local-news/5560774/115m-clean-up-bill-for-newcastle-gasworks-site/

237 total views, 1 today

Tags: , , , , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*